Friday, July 24, 2026

Trail Work 2026

 



 Trail work done in 2026 to date.

Summary (to date) Total 22 days. 88 hours trail work, 155 hours total including travel time.

Days at Alpine Baldy: 15. Hours at Alpine Baldy: 62.5 (10 hours FS6066, 52.5 hours trail)

Hours at AB including drive time: 122.5

Hours from friends including drive time: 16

Total hours at AB including drive time: 138.5

Days at Olallie: 6. Hours at Olallie: 13.5

Other Hours: 12

Count DaysDayWork HoursLocationTravel HoursTypeMatched?
22Jul 115Alpine Baldy4treesN/A
21Jul 094Alpine Baldy4treesN/A
20Jul 043Alpine Baldy4treesN/A
19Jun 134Alpine Baldy4treesY
18May 272Alpine Baldy4treesY
17May 223.5Alpine Baldy4treesY
16May 184Alpine Baldy4treesY
15May 173Alpine Baldy4treesY
14May 104Alpine Baldy4treesY (6)
13May 066Alpine Baldy4treesY (4)
12Apr 254Alpine Baldy4treesY
11Apr 235Alpine Baldy4treesY
10Apr 195Alpine Baldy4treesY
9Apr 096Alpine Baldy4treesY
8Apr 054Alpine Baldy4treesY
7Feb 0512Stihl4TrainingY
6Jan 173Olallie1treesY
5Jan 160.5Olallie1treesY
4Jan 133Olallie1treesY
3Jan 104Olallie1treesY
2Jan 092Olallie1treesY
1Jan 031Olallie1treesY

Sat, Jul 04, 3 hours

Alpine Baldy. I removed 3 trees with the pole saw. Rode with Ethan.

Sat, Jun 13, 4 hours

Alpine Baldy. Massive tree and secondary tree fully removed to meet forest service standards.

Fri, May 27, 2 hours

Alpine Baldy. Small trees past the avalanche debris field, at beginning of climb. I did finishing touches to the early part of the trail for minor stuff, so you won't find branches on the trail as far as the red pushpin marker on the image with the GPS.

Fri, May 22, 3.5 hours

Alpine Baldy. Rework for previous trees cleared to meet standards of distance from trail to ensure people stay on the trail.

Mon, May 18, 4 hours

Alpine Baldy. Just past the avalanche debris field, there is a chunk of trail that is going to turn into a small landslide. I cut the trees at that location back further, I figure the trail is going in the creek, best to prepare for moving it, though even that location the ground is soft I think that's going to go as well. Afterwards I moved up the trail to clear a section of log debris that floated onto the trail and further trees up the trail.

Sun, May 17, 3 hours

Alpine Baldy. I worked a single location for two large trees down and blocking the trail. On top of the 7 cuts for each round, I had to do a few extra cuts as it initially fell so as to bind it from moving. Significant effort to roll the logs off the trail as they were large diameter and width.

Sun, May 10, 4 hours

Alpine Baldy. Pole saw. Cleared huge tangle of brush and debris just past the avalanche debris field. Cleared more trees for another quarter mile at beginning of the climb section.

Wed, May 06, 6 hours

Alpine Baldy. Pole saw work for many small to medium trees blocking the trail. Cleared as far as the avalanche debris field.

Sat, Apr 25, 4 hours

Alpine Baldy. Chainsaw work and Ethan did the tread work. The focus area was the two major washouts a half mile into the trail. Ethan routed the trail properly to original location through the washouts. I cleared enough rounds in the massive tree to allow bike to pass through.

Thu, Apr 23, 5 hours

Alpine Baldy. Trail work with Maarten. I was on the chainsaw and Maarten did the swamp work of clearing debris, branches, and logs not only for the work area but also items along the trail. The log I started on Sunday is now cut through so that it is resting on the ground and most of a second cut to remove enough log to allow a bike to go through.

Sun, Apr 19, 5 hours

Alpine Baldy. Removing downed trees in a washout that took out the trail, so as to allow safe passage through the washout. Swamping the huge mess at the top of a massive tree that is blocking trail half mile in.

Thu, Apr 09, 6 hours

Alpine Baldy. Clearing the FS 6066 leading up to the Jennifer Dunn trail head that serves Alpine Baldy trail. Finished to within 1.7 miles of trailhead. Notified Forest Service who came in next day with 3 trucks to finish the road including culvert work.

Sun, Apr 05, 4 hours

Alpine Baldy. Chainsaw / swamping work on FS 6066, the forest service road leading to Alpine Baldy.

Thu, Feb 04 to Fri, Feb 05, 12 hours

Stihl Headquarters. 2-day class on chainsaw maintenance at the Stihl headquarters in Centralia. Sponsored by Evergreen Mountain Bike Alliance for purposes of their chainsaw volunteering efforts.

Sat, Jan 17, 3 hours.

Olallie. First, I removed a tree left halfway in the trail by previous hand sawyer. Then I fixed a clogged culvert that was streaming across the trail and fortified it with rocks and a log to slow down future clogging. Next, I removed two huge logs that had been cut earlier but left by side of the trail, to get them far off the trail. Finally, I tossed a few logs at another section that had been cut from a tree in a drain.

Fri, Jan 16, 0.5 hours

Olallie. Handsaw for trees not up to standards.

Tue, Jan 13, 3 hours

Olallie. Chainsaw. Cleared trees many of which had been started but not up to standards by being fully off the trail.

Sat, Jan 10, 4 hours

Olallie. Chainsaw with Ethan. We cleared 4 significant trees.

Fri, Jan 09, 2 hours
Olallie. Chainsaw to finish medium tree that was blocking trail. Removed another tree that was in a drainage.

Sat, Jan 03, 1 hours

Olallie. Pole saw to start a medium tree that was blocking trail. Short day due to equipment issue.






No comments: