Trail work done in 2026 to date.
Summary (to date) Total 22 days. 88 hours trail work, 155 hours total including travel time.
Days at Alpine Baldy: 15. Hours at Alpine Baldy: 62.5 (10 hours FS6066, 52.5 hours trail)
Hours at AB including drive time: 122.5
Hours from friends including drive time: 16
Total hours at AB including drive time: 138.5
Days at Olallie: 6. Hours at Olallie: 13.5
Other Hours: 12
| Count Days | Day | Work Hours | Location | Travel Hours | Type | Matched? |
|---|---|---|---|---|---|---|
| 22 | Jul 11 | 5 | Alpine Baldy | 4 | trees | N/A |
| 21 | Jul 09 | 4 | Alpine Baldy | 4 | trees | N/A |
| 20 | Jul 04 | 3 | Alpine Baldy | 4 | trees | N/A |
| 19 | Jun 13 | 4 | Alpine Baldy | 4 | trees | Y |
| 18 | May 27 | 2 | Alpine Baldy | 4 | trees | Y |
| 17 | May 22 | 3.5 | Alpine Baldy | 4 | trees | Y |
| 16 | May 18 | 4 | Alpine Baldy | 4 | trees | Y |
| 15 | May 17 | 3 | Alpine Baldy | 4 | trees | Y |
| 14 | May 10 | 4 | Alpine Baldy | 4 | trees | Y (6) |
| 13 | May 06 | 6 | Alpine Baldy | 4 | trees | Y (4) |
| 12 | Apr 25 | 4 | Alpine Baldy | 4 | trees | Y |
| 11 | Apr 23 | 5 | Alpine Baldy | 4 | trees | Y |
| 10 | Apr 19 | 5 | Alpine Baldy | 4 | trees | Y |
| 9 | Apr 09 | 6 | Alpine Baldy | 4 | trees | Y |
| 8 | Apr 05 | 4 | Alpine Baldy | 4 | trees | Y |
| 7 | Feb 05 | 12 | Stihl | 4 | Training | Y |
| 6 | Jan 17 | 3 | Olallie | 1 | trees | Y |
| 5 | Jan 16 | 0.5 | Olallie | 1 | trees | Y |
| 4 | Jan 13 | 3 | Olallie | 1 | trees | Y |
| 3 | Jan 10 | 4 | Olallie | 1 | trees | Y |
| 2 | Jan 09 | 2 | Olallie | 1 | trees | Y |
| 1 | Jan 03 | 1 | Olallie | 1 | trees | Y |
Sat, Jul 04, 3 hours
Alpine Baldy. I removed 3 trees with the pole saw. Rode with Ethan.
Sat, Jun 13, 4 hours
Alpine Baldy. Massive tree and secondary tree fully removed to meet forest service standards.
Alpine Baldy. Small trees past the avalanche debris field, at beginning of climb. I did finishing touches to the early part of the trail for minor stuff, so you won't find branches on the trail as far as the red pushpin marker on the image with the GPS.
Fri, May 22, 3.5 hours
Alpine Baldy. Rework for previous trees cleared to meet standards of distance from trail to ensure people stay on the trail.
Mon, May 18, 4 hours
Alpine Baldy. Just past the avalanche debris field, there is a chunk of trail that is going to turn into a small landslide. I cut the trees at that location back further, I figure the trail is going in the creek, best to prepare for moving it, though even that location the ground is soft I think that's going to go as well. Afterwards I moved up the trail to clear a section of log debris that floated onto the trail and further trees up the trail.
Sun, May 17, 3 hours
Alpine Baldy. I worked a single location for two large trees down and blocking the trail. On top of the 7 cuts for each round, I had to do a few extra cuts as it initially fell so as to bind it from moving. Significant effort to roll the logs off the trail as they were large diameter and width.
Sun, May 10, 4 hours
Alpine Baldy. Pole saw. Cleared huge tangle of brush and debris just past the avalanche debris field. Cleared more trees for another quarter mile at beginning of the climb section.
Wed, May 06, 6 hours
Alpine Baldy. Pole saw work for many small to medium trees blocking the trail. Cleared as far as the avalanche debris field.
Sat, Apr 25, 4 hours
Alpine Baldy. Chainsaw work and Ethan did the tread work. The focus area was the two major washouts a half mile into the trail. Ethan routed the trail properly to original location through the washouts. I cleared enough rounds in the massive tree to allow bike to pass through.
Thu, Apr 23, 5 hours
Alpine Baldy. Trail work with Maarten. I was on the chainsaw and Maarten did the swamp work of clearing debris, branches, and logs not only for the work area but also items along the trail. The log I started on Sunday is now cut through so that it is resting on the ground and most of a second cut to remove enough log to allow a bike to go through.
Sun, Apr 19, 5 hours
Alpine Baldy. Removing downed trees in a washout that took out the trail, so as to allow safe passage through the washout. Swamping the huge mess at the top of a massive tree that is blocking trail half mile in.
Thu, Apr 09, 6 hours
Alpine Baldy. Clearing the FS 6066 leading up to the Jennifer Dunn trail head that serves Alpine Baldy trail. Finished to within 1.7 miles of trailhead. Notified Forest Service who came in next day with 3 trucks to finish the road including culvert work.
Sun, Apr 05, 4 hours
Alpine Baldy. Chainsaw / swamping work on FS 6066, the forest service road leading to Alpine Baldy.
Thu, Feb 04 to Fri, Feb 05, 12 hours
Stihl Headquarters. 2-day class on chainsaw maintenance at the Stihl headquarters in Centralia. Sponsored by Evergreen Mountain Bike Alliance for purposes of their chainsaw volunteering efforts.
Sat, Jan 17, 3 hours.
Olallie. First, I removed a tree left halfway in the trail by previous hand sawyer. Then I fixed a clogged culvert that was streaming across the trail and fortified it with rocks and a log to slow down future clogging. Next, I removed two huge logs that had been cut earlier but left by side of the trail, to get them far off the trail. Finally, I tossed a few logs at another section that had been cut from a tree in a drain.
Fri, Jan 16, 0.5 hours
Olallie. Handsaw for trees not up to standards.
Tue, Jan 13, 3 hours
Olallie. Chainsaw. Cleared trees many of which had been started but not up to standards by being fully off the trail.
Sat, Jan 10, 4 hours
Olallie. Chainsaw with Ethan. We cleared 4 significant trees.
Sat, Jan 03, 1 hours
Olallie. Pole saw to start a medium tree that was blocking trail. Short day due to equipment issue.

No comments:
Post a Comment